Province of British Columbia
  • Skip to main content
  • Skip to navigation
  • Accessibility Statement

ARFD

  1. Home
  2. Farming, Natural Resources & Industry
  3. Natural Resource Use
  4. Land Use
  5. Crown Land
  6. ARFD
  7. ARFD - Home
  8. ARFD - View

Applications and Reasons for Decisions (ARFD)

[PENDING : APPLICATION UNDER REVIEW]

Client: BC Hydro & Power Authority
Purpose: UTILITY/ELECTRIC POWERLINE
Region: Lower Mainland, Surrey
Agency: Crown Land Allocation
File: #2410906

Apr 26, 2016

Location: Hemlock Valley Road, Weaver Lake
Area (Hectares): 0.062 ha
BCGS Mapsheet: 92H031
Legal Description: RIGHT OF WAY OVER UNSURVEYED CROWN LAND, AS SHOWN ON PLAN EPP50436 FILED IN NEW WESTMINSTER LAND TITLE OFFICE

 

BC Hydro has finalized the construction and legal survey of the electric power line that was authorized in 2013. This power line is an extension of an existing BC Hydro line to connect to the Sakwi Creek power project. This application is to authorize a Statutory Right of Way over the constructed and surveyed area.



2411906 - Management Plan and Maps

[application/pdf]



DECISIONS
NOTICE: No decisions have been made for this application at this time.

END DECISIONS

Did this article contain the information you required?   [ Yes | No | Cancel ]

Having trouble opening a file? Please try saving it to your desktop and opening it from there. For any technical issues with this website, please contact the NRS Business Service Desk at nrsenquiries@gov.bc.ca or 250 952-6801 for assistance. Thank you

Back to top
  • Home
  • About gov.bc.ca
  • Disclaimer
  • Privacy
  • Accessibility
  • Copyright
  • Contact Us